For water and sewer contractors
Government contracts for water and sewer contractors
Public water and sewer infrastructure is rebuilt on contract, continuously — water main and distribution replacement, sanitary and storm sewer rehabilitation, lift and pump stations, force mains, water storage tanks and reservoirs, wells, manholes and septic systems — under NAICS 237110. YNTELRADAR takes each one from found to won: we score it against your business, read the plan-and-profile sheets, geotechnical borings, trench and shoring details, the bypass-pumping plan, the pressure-testing and disinfection specs and the traffic control and dewatering permits that decide your real cost per foot, show what the government actually paid on comparable water and sewer awards and who won them, draft your proposal from the solicitation, and walk you through every step until the award. In English or Spanish.
How it works
Tell us your trade
What you actually do, your NAICS codes and the states you work in. Two minutes, once.
We find it and score it against you
Federal, state and local. Every new solicitation scored 0–100 against your business, with the reasons written out so you can check them.
We take you from found to won
We read the documents, show what the government actually paid on comparable awards, draft your proposal and walk you through every step to submit — tracked from Interested to Won.
What lands in your feed
Open contracts in this trade right now — pulled live from the corpus, not examples.
88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION
Department of Defense
Forest Wide Well Decommissioning Mystic River and Custer Ranger Districts, Black Hills National Forest, South Dakota
Department of Agriculture
BITTERROOT NATIONAL FOREST - Sula & West Fork Residential Sewer Cleanouts
Department of Agriculture
Simple pricing
Founding pricing, locked while it lasts. Cancel anytime.
Starter
LimitedFor solo operators bidding on their first contracts.
- Every federal opportunity, scored 0–100 with the reasons
- One-line summary on 4 of every 5 notices
- Full solicitation text + attachments (federal)
- Pipeline tracking with notes
- Read / unread + amendment tracking
Pro
Early adopterFor teams that bid seriously and can't miss a deadline.
- The AI that explains it and drafts it for you
- Who won similar contracts + historical award values
- Full application guide — how to actually bid
- Bidy, your AI secretary — acts on your bids
- AI proposal drafts, compliance matrix, email the officer
Scale
For agencies running many pipelines at once.
- Every state we cover — pre-selected, editable
- Local coverage — cities & counties, added weekly
- Recompete predictor — get known before the RFP drops
- Teaming matchmaking — the partner that closes your eligibility gap
- Pricing intelligence — what similar work actually got awarded
Questions people in this trade ask
What NAICS code covers water and sewer construction contracts?
237110 — Water and Sewer Line and Related Structures Construction. It covers water mains and distribution, sanitary and storm sewers, lift stations, force mains, storage tanks, wells and the structures that go with them. It's the first filter a contracting officer applies and the first thing we score your feed against.
How many water and sewer contracts are open right now?
The live counter at the top of this page shows the open water and sewer solicitations in the corpus right now, plus roughly how many new ones post each week. It's a real count against active opportunities, not an estimate.
Is most of this work federal or local?
Both, and the local side is where the volume lives: cities, water districts, counties and utility authorities put out water main replacement and sewer rehabilitation constantly, while the federal side is bases, national parks, VA campuses and Corps of Engineers projects. We pull federal, state and local sources into one feed so you see all of it in the counties you actually work.
Do you flag the bonding and prequalification requirements?
Yes. Utility work is where prequalification bites hardest — many owners require a prequalified contractor list, a payment and performance bond at 100%, and documented experience on comparable footage or pipe diameter. We read the front-end documents and surface those requirements with the opportunity, so you know before you spend a week on the takeoff.
Can I see the pipe sizes and quantities before I commit to bidding?
That's exactly what reading the documents is for. Bid schedules, quantities and pipe materials live in the attachments, not in the notice — we pull them out with the opportunity, so a job that turns out to be 200 feet of 8-inch never eats a day of your estimator's time.
Everything you get
The whole cycle, on every contract
Finding the notice is the part everyone does — it is public. This is the rest of the job.
Federal, state and local
We are not a SAM.gov reader — SAM is one source of many. State portals, plus cities, counties, school districts and universities. The map shows exactly how deep we go in your state.
Scored against your business
Every notice gets 0–100 against your codes, your states and the work you actually do — with the reasons written out and checkable against the notice itself, not a number you have to trust.
The solicitation documents, read for you
We open the attachments and pull out the scope, what you need to qualify, the conditions and every date — including whether the pre-bid meeting is mandatory. And you can put a question to the documents.
Priced from what the government actually paid
Not what the notice asks for: the award history under the same code, with real amounts, so your number starts from evidence instead of a guess.
Who won
The companies that won comparable contracts under the same code, with the agency, the amount and the date. Where a code has no history on file we say so, instead of showing zeros.
Recompetes
Multi-year contracts coming up for renewal, spotted well before the notice is published — the work starts long before the solicitation does.
Teaming
Partner matching for the work you can't take on alone — and only partners we actually hold a contact for.
The proposal, drafted
A proposal draft built from the solicitation and your profile, the compliance matrix, and the email to the contracting officer. You edit instead of starting from a blank page.
From found to won
The capture plan with its tasks, the deadlines on your calendar — exportable to .ics, which nobody else in this market does — and the bid followed through to its result.
Daily digest and instant alerts
A daily digest built around your profile, instant alerts on what can't wait, and a warning when a deadline moves. The product chases you, not the other way round.
In English and in Spanish
The whole product in English and Spanish — the feed, the emails, the PDFs and everything the AI writes. Not a translated home page.
Every tool in this market covers a slice of that list, and some cover their slice very well. Nobody else covers the whole cycle — that is what we built.
The next one is already posted.
7-day free trial — full Pro access. Cancel in one click, no sales call.